Building 1 of a 3-phase building plan was completed in Aug 2006.
It serves as a multi-purpose building until buildings 2 and 3 are completed.

At right is the site-plan. The green-roofed area is
bldg. 1 and the 2 red roofed bldgs. are phase 2
and 3 respectively. The fan-shaped bldg. will be the Worship center and will serve as our phase-3 project
